The following are some pictures of todays progress on my kr2s.
I started the day by building the “V” shaped piece that transfers the load from the spar to the fuselage.
Next, I laminated two strips of thin spruce to the rudder post. The spar was originally cut for the old airfoil and was to narrow.
Having much better luck than normal I cut the front vertical spar.
Finally, the most difficult job of the day was locating where the spar passes through the bulk head.