kr update


The following are some pictures of todays progress on my kr2s.


I started the day by building the “V” shaped piece that transfers the load from the spar to the fuselage.


Next, I laminated two strips of thin spruce to the rudder post. The spar was originally cut for the old airfoil and was to narrow.

Having much better luck than normal I cut the front vertical spar.

Finally, the most difficult job of the day was locating where the spar passes through the bulk head.

,