Well I am posting an update, so that means I did not sell my KR. NOPE, I am back to building!
see 🙂
The next is dry glass over the canopy bottom frame.
Here the glass is wetted out and drying.
after both sides are dried it is time for the test, and it OPENS!
these next pictures are hanger rash that i have a lot of
gap seals for elevator
Oh yeah cant forget the new building shack. Cheap, small, but its at home
Last for to day my helper, Levi he likes to climb.
One response to “KR up date 08/25/08”
Love the helper on the ladder. I’m sure that with his help, it only takes you twice as long to get anything done.